650,000.00 €
- 42107 m²
Property for
Sale
Property area
107 m²
Bedrooms
4
Bathrooms
2
Updated
Nov 22, 2024
Country
Croatia
State/Region/Province
Splitsko-dalmatinska županija
City
Okrug
City area
Okrug Gornji
ZIP code
21223
Energy efficiency
In preparation
Number of parking spaces
1
Description
New building in Okrug Gornji with six luxury apartments, two per floor. There is a penthouse apartment S5 on the first floor, which consists of a hallway, living room, dining room, kitchen, two bedrooms and two bathrooms. The apartment also includes one garage space, with the possibility of buying an additional garage space. The apartment is also adorned with a beautiful roof terrace with a swimming pool and sunbathing area, and an outdoor shower. The roof terrace will have a separate entrance door, while the elevator leads directly from the basement garage. Electrical installations, hot and cold water and drainage will be carried out, and ambient LED lighting will be installed to create a special atmosphere. The owner will be able to set up a pergola, a summer kitchen and an electric grill if he wishes. Interior space of 73.50 m2 with two bedrooms, covered balcony, uncovered balcony, swimming pool, roof terrace, garage space, for 107.36 m2 of net living space.
The apartment is being built to extremely high standards and extremely equipped, including top-quality Daikin air conditioners in each room, underfloor heating throughout the apartment with the possibility of regulating each room separately, excellent PVC joinery with three-layer insulated glass and mosquito nets on all openings, aluminum balcony sliding doors, aluminum shutters with electric lifters on windows and doors, modern tiles and quality parquet floors of your choice, excellently equipped bathrooms, first-class thermal and hydro insulation, and anti-burglary and fire-resistant entrance doors. Pool heating installations will also be installed. The building is located in a very attractive location, slightly elevated position with a spectacular view of the sea. The sea and the beach, as well as all additional facilities, are nearby.
Construction works are already well underway and are planned to be completed by spring 2025 at the latest.
ID CODE: D-0917
- View QR Code
-
- Current rating: 0
- Total votes: 0
- Save as PDF
- 29 Shows